Design Guides

Know what matters before you build.

Field notes on materials, buildings, systems and the decisions worth making early — while they are still inexpensive to change.

Before selecting finishes, clarify the condition of the property, the work that is actually required, the level of intervention, the decisions that must be made early and the parts of the existing architecture worth preserving.

01

Existing conditions before aesthetics

Walk the building before you shop for it. Structure, moisture, electrical service, plumbing age and roof condition set the true floor of the budget, and every one of them is cheaper to find now than after demolition. A renovation that begins with a finish schedule usually ends with a change order.

02

Define what must change

Separate what genuinely does not work from what is simply dated. A kitchen that cooks badly is a plan problem; a kitchen you have stopped liking is a finish problem. They cost very different amounts to solve, and confusing them is the most common way a renovation runs away.

03

Identify what should remain

Older buildings usually contain something worth keeping — a stair, a fireplace, plaster, a window proportion, a floor that will never be milled that way again. Decide what stays before the crew arrives, because nothing is easier to lose in a demolition week.

04

Establish an investment framework

A range is enough to begin; a number is not required. What matters is that scope and investment are agreed before drawings develop, so the design is built for the budget rather than value-engineered down to it afterward.

05

Plan for hidden infrastructure

HVAC runs, structural headers, waste lines and electrical panels decide what a plan can actually do. Ceilings drop, soffits appear and islands move because of things nobody can see. Getting these coordinated during design is what keeps the built room faithful to the drawing.

06

Understand long-lead decisions

Stone slabs, custom millwork, imported tile, appliances and windows can run months, and they often need to be selected before anything visible has happened. The decisions that feel earliest are usually the ones the schedule depends on.

07

Know when documentation is complete enough to build

Building from an incomplete set transfers every unanswered question to the job site, where it gets resolved by whoever is standing there. Complete documentation is not bureaucracy; it is the mechanism that keeps the finished room equal to the design.

08

Decide who is responsible for what

Design, procurement, construction, and the coordination between them are four different jobs. Name who owns each one at the start — particularly on projects with more than one firm involved — and most disputes never happen.

From the work
Cobblestone Residence — the drawing over the room as found
Cobblestone Residence — the drawing over the room as found

The kitchen was measured and drawn before a single finish was chosen. Working over the existing conditions is what made the hood, the niches and the range wall land exactly as drawn — and what surfaced the framing and ventilation problems while they were still cheap to solve.

Begin a renovation brief  →

A beautiful space can still be the wrong space. Review the building, utilities, access, code implications, visibility, operational fit and required construction before committing to a lease.

01

Existing use + change of use

A space built for retail does not automatically become a restaurant, a clinic or a studio. Changing occupancy classification can trigger requirements — exiting, ventilation, plumbing fixture counts — that cost more than the build-out itself.

02

Power, HVAC, plumbing + infrastructure

Verify the service that is actually there, not what the listing implies. Electrical capacity, existing tonnage, gas availability and where the waste line sits will determine whether your floor plan is possible or merely attractive.

03

Accessibility + life safety

Restrooms, door clearances, thresholds, exit paths and alarm systems are the least glamorous line items and the least negotiable. They should be understood before the lease, because they cannot be designed away afterward.

04

Landlord work vs tenant work

Read exactly where the landlord’s obligation ends. “Warm shell” means different things in different markets, and the gap between what is delivered and what you assumed is paid for by you.

05

Signage + exterior identity

Confirm what the landlord, the municipality and any tenant association will actually permit before you build a brand around it. Sign area, illumination, placement and material are usually regulated, sometimes tightly.

06

Delivery + service access

Where deliveries land, where trash goes, where staff park and how equipment gets in are operational realities that shape a plan. A beautiful room with no back-of-house route will be fought daily by the people working in it.

07

Schedule realities

Permitting, landlord approvals, long-lead equipment and inspection sequencing all run on their own clock. Rent frequently begins before a business can open; know that number before signing.

08

Improvement allowance + construction responsibility

A tenant improvement allowance is a negotiation, not a fixed figure — and how it is disbursed matters as much as its size. Establish who holds the contract, who carries the risk, and when funds are actually released.

09

Brand experience vs operational reality

The space has to express the business and let it run. Where those conflict, resolve it on paper. A concept that cannot be operated will be quietly dismantled by staff within a year.

From the work
Wash & Folde — the frontage as found
Wash & Folde — the frontage as found

The tenancy came with mismatched signage, an inherited storefront and a facade that had been added to for years. Reviewing what could and could not be changed — and what the landlord and city would permit — came before any concept work.

Request a property study  →

Integrated lighting, automated shades, security, access, network, AV, climate and water protection require infrastructure that is far easier to coordinate during design than after finishes are complete.

01

Decide what should be visible

Every system has a visible portion — a keypad, a thermostat, a speaker, a camera. Decide early which of those you want to see and which should disappear, because concealment is a framing and millwork decision, not a device decision.

02

Network before devices

The network is the foundation everything else stands on. Plan coverage, access point locations and wired runs first; a beautiful integrated house on a weak network is an unreliable one.

03

Power + low-voltage planning

Low-voltage runs are pulled before drywall and are painful to add afterward. Even systems you are not installing yet should have their pathways provided, because conduit is cheap and demolition is not.

04

Shade pockets + window integration

A concealed shade requires a pocket framed at rough-in, coordinated with the ceiling, the header and the drapery. Decided late, it becomes a surface-mounted roller and a visible fascia — the exact thing you were trying to avoid.

05

Lighting control locations

Keypads should sit where a hand naturally reaches, sized to the plate and grouped so a guest can read the room. Scene programming matters less than putting the right control at the right door.

06

Security + access points

Camera angles, lock hardware, intercom placement and gate control should be set against the floor plan and the door schedule, so finishes match and nothing is surface-mounted as an afterthought.

07

Leak detection + shutoff strategy

Sensors at every wet wall and an automatic shutoff at the main are among the least expensive systems in the house and prevent the most expensive failure. Add freeze monitoring on exterior runs and the alert reaches a phone before it reaches a ceiling.

08

Equipment locations + ventilation

Racks generate heat and need air, service access and a home that is not a closet in a bedroom wall. Locate and ventilate them during design.

09

Plan for serviceability

Someone who did not install the system will eventually maintain it. Labelled runs, documented configurations and reachable equipment are what keep a system alive after the original integrator moves on.

10

Future expansion

You do not have to install everything at once, but you should preserve the option. Pathways, capacity and a coherent architecture let systems be phased over years instead of rebuilt.

From the work
The Atelier — lighting as architecture
The Atelier — lighting as architecture

The halo behind the monogram, the entry glow and the interior wash were drawn with the elevation rather than added to it. Every driver, run and control location was resolved before the facade was closed, which is why nothing about the system is visible in the finished building.

Explore Intelligent Environments  →
Forthcoming / The Guide Series

Notes currently taking shape in the studio.

Understanding Natural Stone
Lighting in Layers
Designing for Aging in Place Without Making It Look Institutional
Commercial Materials That Can Actually Take the Wear
When Custom Millwork Is Worth It
Planning a Wet Room
What to Know Before Ordering Imported Material
Selecting Window Treatments for Heat, Privacy + View
What a House Book Should Contain
Why the Last 5% of a Project Takes So Much Coordination
Ask first

A guide is no substitute for looking at your building.

These are the questions worth answering early. The answers, though, are specific to your property, your scope and how you intend to use the space — which is what Vision Studio and a project brief are for.